Case Studies

DICHTOMATIK Works with Steel Manufacturer to Reduce Lead Times and Provide Cost Savings

Our Main Objective is Your Success!   Challenge A National steel mill manufacturer was experiencing a high number of work roll bearing failures. They had increased the line speed to the point that grease lubrication of the roll stand bearings was not acceptable and were forced to install a new automatic oil lubrication system. While […]

Read more

Dichtomatik Works with National Food Manufacturer to Reduce Downtime and Creates a Seal Eliminating Food Contamination.

By Dichtomatik on 29 January 19 Blog,Case Studies

A national chocolate manufacturer was in need of a quick and cost-effective solution that would reduce production downtime, provide cost savings; and create a seal that would eliminate food contamination from foreign materials.  Seals from the competitor had failed multiple times in the field causing metal contamination and shutting down machines for days at a […]

Read more